The Apron Expansion Project of Daqing Airport Passed Inspection for the Acceptance of the CAAC’s Northeast Regional Administration
In October, the apron expansion & temporary de-icing strip establishment project at Daqing Saertu (Daqing Airport for short) Airport passed the inspection acceptance of the CAAC’s Northeast Regional Administration smoothly. This signifies that the two newly built aprons and the newly built temporary de-icing strip will now be put into service.
In this expansion project, a pavement of concrete cement that is 36 centimeters thick and 17,250 square meters, a service-vehicle traffic lane of cement concrete that is 22 centimeters thick and 1,030 square meters in size and other supporting facilities have been newly built. The temporary de-icing strip of 8,325 square meters is the first one in all of the regional airports in the Heilongjiang province. In the temporary de-icing strip part, the waste liquid flows automatically and there is a collection pond of 80 cubic meters so that the current drainage system will be adequately used.