Play China Marketing Video
Volume 14,Issue 3 Autumn 2012

Xinjiang ATMB meets on RVSM

Search

The Xinjiang Air Traffic Management Bureau held the reduced vertical separation minimum (RVSM) regional coordination meeting which ended on July 20. Participants including air traffic management experts from the Xinjiang ATMB, Russia, Kazakhstand and Kyrghyz Republic, discussed control transfer and reached agreement. Director Cao Qiong and Vice Director Zeng Zhaolin of Xinjiang ATMB talked with trilateral air traffic management experts. Before the meeting, Xinjiang ATMB had done preparatory work for the RVSM implementation, including the creation of a Xianjian area operation plan. It was noted that the altitude layer system transfer with neighboring countries poses difficulty in implementing RVSM work. Xinjiang signed draft agreements with Kazakhstan and Kyrghyz Republic, and had an initial understanding with Russia on bilateral altitude layer transfer. This will serve as the basis for Xinjiang ATMB to fulfill implementation of RVSM in the Urumqi flight information region by November 21.

[ Print ][ Close ]

Copyright © 2012 by Uniworld, LLC All rights reserved

To request permission to use content,Email China Civil Aviation